Operating
Open-pit
Flotation processing capacity surpassed 12,000 tpd
Entered into an expansion feasibility study contract with Zijin Engineering for a 10 million tpa expansion, aiming to increase capacity to 13 million tpa. Total contract value USD 2.89 million.
Exploration: Drilled 1,071 holes totaling 124,478.66 meters for the year
Discovered mineralization extending southward at depth in the CVG section, and identified a new gold mineralization zone at greater depth in the DAW section (30-80m thick, avg. grade ~1.0 g/t Au), indicating significant exploration potential.
2025
2025
- Resources
- Reserves
| Class | Type | Tonnages (kt) |
Au (g/t) |
Au (koz) |
|---|---|---|---|---|
| Measured | Oxide | 400 kt | 0.88 | 10 |
| Transitional | 800 kt | 1.01 | 30 | |
| Fresh | 39,300 kt | 0.92 | 1,170 | |
| Sub Total | 40,600 kt | 0.92 | 1,200 | |
| Indicated | Oxide | 2,200 kt | 0.8 | 60 |
| Transitional | 2,500 kt | 0.92 | 70 | |
| Fresh | 240,300 kt | 0.96 | 7,430 | |
| Sub Total | 245,100 kt | 0.96 | 7,560 | |
| Inferred | Oxide | 2,700 kt | 0.77 | 70 |
| Transitional | 1,900 kt | 0.72 | 40 | |
| Fresh | 174,700 kt | 0.73 | 4,110 | |
| Sub Total | 179,300 kt | 0.73 | 4,220 | |
| Grand Total | 464,900 kt | 0.87 | 12,970 | |
| Class | Tonnages | Au (g/t) |
Au (koz) |
|---|---|---|---|
| Proved | 37.0 Mt | 0.94 | 1,121 |
| Probable | 205.6 Mt | 1.01 | 6,655 |
| Total | 242.5 Mt | 1 | 7,777 |