EN
  • 繁
  • 簡

Operations & projects

China - jiangxi yifeng
Xinzhuang Copper-Lead-Zinc Mine

Operating

Status

Underground

Mining Method

Mining and processing capacity upgraded to 900,000 tpa. The copper-iron processing plant achieved a capacity of 800,000 tpa following technical transformation for high efficiency, energy saving, and automation.

Capacity
100 %

owned through wholly-owned subsidiary Yifeng Wanguo

ownership
1,104,189 tonnes

2025

Ore Processed
1,076,822 tonnes

2025

Ore Mined
Mineral Resources (as of 31 Dec 2025)
13.81 Mt @ 0.72 % Cu
Cu-Fe
3.65 Mt @ 0.72 % Cu
Fe-Cu
2.61 Mt @ Zn, 1.39 % Pb
Cu-Pb-Zn
  • Resources
  • Reserves
Mineralization
Type
JORC Ore Reserve
Category
Tonnage (kt) Cu
(%)
Pb
(%)
Zn
(%)
TFe
(%)
mFe
(%)
Cu-Fe Measured 4,132.12 0.76 - - - -
Indicated 9,677.97 0.71 - - - -
Subtotal 13,810.09 0.72 - - - -
Inferred 443.49 0.49 - - - -
Total 14,253.58 0.72 - - - -
Fe-Cu Measured 1,298.47 0.19 - - 44.17 30.89
Indicated 2,158.66 0.34 - - 39.59 25.15
Subtotal 3,457.13 0.28 - - 41.31 27.31
Inferred 191.19 0.52 - - 44.13 31.02
Total 3,648.32 0.30 - - 41.46 27.50
Cu-Pb-Zn Measured 988.17 0.13 0.95 5.17 - -
Indicated 1,370.45 0.09 1.88 3.70 - -
Subtotal 2,358.62 0.11 1.49 4.32 - -
Inferred 247.78 0.13 0.39 4.44 - -
Total 2,606.40 0.11 1.39 4.33 - -
Totals Indicated + Measured + Inferred 20,508.30 - - - - -
Mineralization
Type
JORC Ore Reserve
Category
Tonnage
(kt)
Grades Contained Metals
Cu
(%)
Pb
(%)
Zn
(%)
TFe
(%)
mFe
(%)
Cu
(kt)
Pb
(kt)
Zn
(kt)
TFe
(kt)
mFe
(kt)
Cu-Fe Proved 2,996.31 0.77 - - - - 23.07 - - - -
Probable 2,668.93 0.66 - - - - 17.74 - - - -
Total 5,665.24 0.72 - - - - 40.82 - - - -
Fe-Cu Proved 1,526.97 0.21 - - 37.19 32.15 3.17 - - 567.83 490.94
Probable 708.09 0.32 - - 23.17 19.81 2.27 - - 164.06 140.31
Total 2,235.06 0.25 - - 32.53 28.05 5.44 - - 731.90 631.24
Cu-Pb-Zn Proved 578.17 0.08 0.9 4.99 - - 0.49 5.20 28.85 - -
Probable 84.01 0.04 1.31 2.93 - - 0.03 1.10 2.46 - -
Total 662.17 0.08 0.97 4.62 - - 0.52 6.30 31.31 - -
Total Proved 5,101.45 - - - - - 26.73 5.20 28.85 567.83 490.94
Probable 3,461.03 - - - - - 20.05 1.10 2.46 164.06 140.31
Total 8,562.47 - - - - - 46.78 6.30 31.31 731.90 631.24
Note:

The mineral resources also contain meaningful amounts of gold and silver. Based on limited composite sample analysis, the average grade is 0.19 g/t for gold and 13.1 g/t for silver in the Cu-Fe resource, 0.17 g/t for gold and 5.7 g/t for silver in the Fe-Cu resource, and 0.61 g/t for gold and 56.7 g/t for silver for the Cu-Pb-Zn resource.